Built to hold.
Engineered to last.
A bolted-panel steel tank, drawn, fabricated and installed by one team. Scroll to take it apart.
Forty-two ridges of coated steel.
Every panel is corrugated for stiffness and coated in AZ150 aluminium-zinc alloy before it ever meets water. The profile carries the hoop load; the coating carries the years.
- AZ150
- Alloy coating class
- IS 3396
- Design standard
Ships flat. Bolts together on site.
Three tiers, eight panels each, one roof. The whole tank leaves the factory on a single truck and goes up without welding — every seam a bolted, gasket-sealed joint that can be inspected and re-torqued.
- 24
- Wall panels
- 0
- Site welds
Every outlet is a flanged joint.
Nozzles are flanged, gasketed and bolted to the panel, not cut into it after the fact — so a pump swap or a pipe re-route never means a new tank.
From 5,000 to
5,00,000 litres.
Sized to the site, not the catalogue.